Progress…
Things Done:
-Run the fuel supply and return line to the rail (Rail has lines on it, rail is in, hoses need to connect to the supply/return hard lines)
-Finish hooking up the exhaust (ALMOST done!)
-Reinstall the rear beam (ALMOST done!)
-Get a Vacuum T Connector for the Charcoal Canister (got!)
Could Do Tonight:
-Run the vacuum lines
-Run the breather lines
-Connect the lower front valance
-Wire the megasquirt
-Tighten the plugs
-Reinstall the charcoal canister (mostly done)
-Swap the fuel filter
-Install sensors
Things To Do
-Swap the distributor gear
-Fill trans with oil
-Fill engine with oil
-Fill coolant
-Install Serpentine Belt
Things To Buy/Get
-Get a digi ignition module
-Coolant
-Oil
-Transmission Fluid
-Air Filter: 2.75 inch hose, get a 2.75 inch cone filter, 2.75 inch pipe to connect the 2
-Sort out the Alternator, need the bracket, steal Kieran’s
-Get an electric fan and a relay for it